Revamping of ArcelorMittal cooling tower in a record time

Retrofitting in ArcelorMittal

THE CHALLENGE

Due to an increase in the production of its plant in Sagunto, the iron and steel company, ArcelorMittal decided to refurbish the old cooling tower with a revamping. It was a tower of a single concrete cell, measuring 15 x 19 meters. The lack of maintenance had deteriorated markedly over the years, so its revamping was considered a quite complex work.

The rehabilitation of this concrete cooling tower was awarded to Moncobra, EPC Contractor, initially awarded this job to a company of refrigeration solutions, i.e. the supply of materials, supervision of assembly and engineering tasks. A few months later of the award to such company, the contractor and due to the unfulfillment of the terms agreed upon, was forced to terminate this contract having already consumed a large part of the execution period without justifying any progress. Then it and was awarded to TORRAVAL.

SOLUTION

To comply with the required deadlines and with the technical aspects specified by ArcelorMittal, Torraval takes up the project with great flexibility, taking charge of the design and storage in record time of the material for the rehabilitation of the cooling tower.

In addition, a study would also be carried out to guarantee compliance with a thermal program that is more demanding than the previous one, taking advantage of the existing mechanical equipment.

The items supplied were the following:

  • Complete set of high efficiency PVC drift eliminators.
  • Complete set of PVC laminar filling.
  • Galvanized steel purling for the correct support of the filling.
  • Complete set of water distribution system.
  • Cladding of FRP plates.
  • Complete perimeter handrail of FRP.
  • Galvanized steel metal benches for mechanical equipments.
  • Galvanized steel interior platforms for access to mechanical equipments.
  • FRP deflectors for side air intakes.

RESULTS

The works were fully completed in time so that the fully revamping project was in service on the requested date. Torraval accepted the challenge and made his best through an exhaustive planning of both works and visits to ArcelorMittal plant in Sagunto for its correct coordination.


Moreover once studied the thermal program, it was possible to further reduce the cooling temperature, considering the extra challenge of keeping the existing mechanical equipments.

BENEFITS FOR THE CUSTOMER

  • Start-up installation on due date, in a record time.

  • Corrosion resistant materials

  • Compliance with the new, more demanding thermal program by reusing existing mechanical equipment.

  • Appearance of modern and renovated installation.

  • Easy and accessible maintenance

PROJECT VIDEO


     

    Contact us

    In case you need further information about our products or services, do not hesitate to contact us by filling in the form.

    Or call us at: 944 520 000

      This information will not be used for advertising purposes. We will only use your data to respond to your query.

      Proyectos destacados y noticias

      Solicita información

      Si necesitas más información sobre nuestros productos o servicios, no dudes en contactar con nosotros a través del formulario.

      O si lo prefieres, llámanos al:

      94 452 00 00

        Esta información no se utilizará con fines publicitarios. Únicamente utilizaremos sus datos para responder a su consulta.

        2023 © Copyright. Todos los derechos reservados

        Desarrollado por Posik Marketing Digital